She entered service on Septemwith Captain Eugene P. It was in charge of the Bethlehem Steel Company Shipyard, in Fore River Shipyard, Quincy, Massachusetts.
The construction of the USS Long Beach began on December 2, 1957. She was also the US warship with a battery composed entirely of guided missiles. She was the first nuclear-powered surface ship. USS Long Beach (CGN-9) was a cruiser of the United States Navy. NT: In this story you will be Long Beach.